UCSF Long Hospital 4th Floor Hybrid OR
San Francisco, CA
The Design Partnership
2018
​
Multiple phase renovation within the existing operating suite to build out a new Hybrid OR, Control room and upgrades to two other OR's. Project upgraded the mechanical systems to provide 24 air changes within the new operating room, electrical, medical gas, and fire/life safety systems.
​
​
​


Hybrid OR

Hybrid OR Control Room

Temporary Ductwork

Hybrid OR