top of page

project.

location.

architect.

completion date. 

 

scope. 

UCSF Long Hospital 4th Floor Hybrid OR

San Francisco, CA

The Design Partnership

2018

​

Multiple phase renovation within the existing operating suite to build out a new Hybrid OR, Control room and upgrades to two other OR's. Project upgraded the mechanical systems to provide 24 air changes within the new operating room, electrical, medical gas, and fire/life safety systems.

​

​

​

© 2024 Sypult Construction                                                                                                                                                               CA LICENSE #962443       

bottom of page