project.

location.

architect.

completion date. 

 

scope. 

UCSF Long Hospital 4th Floor Hybrid OR

San Francisco, CA

The Design Partnership

2018

Multiple phase renovation within the existing operating suite to build out a new Hybrid OR, Control room and upgrades to two other OR's. Project upgraded the mechanical systems to provide 24 air changes within the new operating room, electrical, medical gas, and fire/life safety systems.

Hybrid OR
Hybrid OR

press to zoom
Hybrid OR Control Room
Hybrid OR Control Room

press to zoom
Temporary Ductwork
Temporary Ductwork

press to zoom
Hybrid OR
Hybrid OR

press to zoom